欧美亚洲日韩久久精品福利_国产高清大片中文字幕_中文字幕无码亚洲八戒31

023-66429246 / 13908322724

News
your location:Home > News

Precautions for automatic permeable brick machine equipment just put into produc

announcer:cqyaoyangrelease time:2021-12-21times


  When the automatic permeable brick machine is just ready to be put into production, what issues should be paid attention to as a brick manufacturer?

  Everything has a run-in period, and the same is true for equipment. I am definitely not very skilled at the beginning. How to spend this run-in period to make the equipment run better?

  The most important thing for mechanical equipment is to understand the load required for the entire operation. Generally, in the initial stage of using the automatic permeable brick machine, the overall load should not exceed 80% of the total load. Reasonably adjust the workload of the automatic permeable brick machine to prevent Equipment failures, such as vibration problems, heat generation, material jams, etc. You can use the cyclical gradual method. At the beginning of using the fully automatic permeable brick machine equipment, you can first let each set idle several times, and slowly get on the right track, after each responsible technician is very familiar with the part of his operation, then slowly add materials Production, don't rush to produce. You can work 6 hours a day in the first week, 8-10 hours in the second week, and 12 hours in later production.

  After more than ten days of production of the automatic permeable brick machine equipment, it is necessary to check whether the vibration box of the machine is normal, whether the vibration frequency is normal, whether the mold box is misplaced, and whether the produced product meets the standard, so that it can be detected which part of the installation is unreasonable , Or there is an error. Generally, the hydraulic oil needs to be refueled after use during the running-in period. When cleaning, the hydraulic cylinder should be cleaned. The hydraulic cylinder of the automatic permeable brick machine should pay great attention to the cleaning problem, there should be no debris in the cylinder, and the sealing work should be done well. Generally, after the running-in period, the equipment can be put into production normally and quickly.